Norwalk, Connecticut

The EFCO HAND-E-FORM® system was used for the construction of the Clubhouse at Oak Hills Park, an 18 hole, public golf course. From the start, this project proved to be a demanding one. EFCO’s HAND-E-FORM system provide the versatility to handle the steps in the foundation walls, as well as the columns. The flange design of the HAND-E FORM allows height and length adjustments to be made in 25 mm (1″) center-to-center increments, making the system adaptable to any dimension.