Valinhos, Sao Paulo, Brazil

The wall coating for the metal storage splinter box at the Eaton Factory had to be completed quickly and with the highest quality concrete finish. Due to the fast assembly and the simplicity of the solution offered, the contractor chose the EFCO HAND-E-FORM® and SUPER STUD systems.